OptemARCH – expressway bridge assembly in 1 day

  1. Homepage
  2. Realizations
  3. OptemARCH – expressway bridge assembly in 1 day
Task: Construction of the S6 expressway Słupsk – Gdańsk on the Bożepole Wielkie section. Beginning of the Tricity bypass.

Structure: PZGd73

Description: Installation of optemARCH prefabricated elements. Construction of the S6 expressway Słupsk – Gdańsk in the Bożepole Wielkie section. Tricity bypass beginning. Segment Szemud – Gdynia Wielki Kack junction. Total assembly time: 1 day.

Gallery

Video

See our other projects

OptemFRP – composite footbridge installation

OptemFRP – composite footbridge installation

Investment description: Construction of a footbridge over the Kumiela river under the task "Expansion of the cycling and pedestrian route system in public road corridors in Elbląg". Structure parameters: bridge length – 16 m, usable width – 3 m,...

read more
OptemFRP – composite deck bridge reconstruction

OptemFRP – composite deck bridge reconstruction

Task: Reconstruction of the bridge over the Łaźna Struga river in the village of Zamoście on road no. 1877N Structure parameters: length 20 m, width 7.7 m, structural height 0.15 m Scope of work: construction of a new composite deck with integrated road...

read more
OPTEM

ul. Na Zboczu 75
80-110 Gdańsk
NIP: 584-273-97-54
KRS:0000541567

tel: (+48) 58 346-40-40
fax: (+48) 58 742-10-70

office@optembridge.com