General – metropolitan bypass construction
Task: Construction of the Tri-City Metropolitan Bypass. Task 1: Chwaszczyno interchange (without interchange) – Żukowo interchange (without interchange). Retaining walls in the passive systemGaleria
Task: Construction of the Tri-City Metropolitan Bypass. Task 1: Chwaszczyno interchange (without interchange) – Żukowo interchange (without interchange). Retaining walls in the passive systemGaleria
Investment description: Construction of a footbridge over the Kumiela river under the task "Expansion of the cycling and pedestrian route system in public road corridors in Elbląg". Structure parameters: bridge length – 16 m, usable width – 3 m,...
Task: Reconstruction of the bridge over the Łaźna Struga river in the village of Zamoście on road no. 1877N Structure parameters: length 20 m, width 7.7 m, structural height 0.15 m Scope of work: construction of a new composite deck with integrated road...
ul. Na Zboczu 75
80-110 Gdańsk
NIP: 584-273-97-54
KRS:0000541567
tel: (+48) 58 346-40-40
fax: (+48) 58 742-10-70