by Magdalena Smyk | Apr 7, 2025 | Realizations
Task: Construction of the Tri-City Metropolitan Bypass. Task 1: Chwaszczyno interchange (without interchange) – Żukowo interchange (without interchange). Retaining walls in the passive system...
by Magdalena Smyk | Mar 21, 2025 | Realizations
Investment description: Construction of a footbridge over the Kumiela river under the task “Expansion of the cycling and pedestrian route system in public road corridors in Elbląg”. Structure parameters: bridge length – 16 m, usable width –...
by Magdalena Smyk | Mar 11, 2025 | Realizations
Task: Reconstruction of the bridge over the Łaźna Struga river in the village of Zamoście on road no. 1877N Structure parameters: length 20 m, width 7.7 m, structural height 0.15 m Scope of work: construction of a new composite deck with integrated road...
by Magdalena Smyk | Mar 11, 2025 | Realizations
Structure parameters: length 140 m, width 5.2 m, structural height 0.15 m Scope of work: construction of a new composite deck with integrated road barriers...
by Magdalena Smyk | Mar 11, 2025 | Realizations
Task: Construction of the Wąchock bypass on national road no. 42...
by Magdalena Smyk | Mar 11, 2025 | Realizations
Task: Design and construction of S19 expressway on the section Bielsk Podlaski Zachód junction (without junction) – Boćki junction (with junction). Investor: General Directorate for National Roads and Motorways....