by Jan Kowalski | Dec 16, 2024 | Realizations
Investment description: Construction of an arch bridge in Nekla. The structure was built using the half-and-half method with nighttime assembly....
by Jan Kowalski | Dec 16, 2024 | Realizations
Task: Construction of the S6 expressway Słupsk – Gdańsk on the Bożepole Wielkie section. Beginning of the Tricity bypass. Structure: PZGd73 Description: Installation of optemARCH prefabricated elements. Construction of the S6 expressway Słupsk – Gdańsk...
by Jan Kowalski | Dec 15, 2024 | Realizations
Project: Design and construction works on railway line no. 16 on the section Ozorków – Łęczyca from km 35.884 to km 47.397, as part of the project: “Works on railway lines no. 15 and 16 on the section Łódź Kaliska – Zgierz – Kutno” Scope:...
by Jan Kowalski | Dec 15, 2024 | Realizations
Project: Frame prefabricated elements with a 7 m span, based on optemFRAME system supports. The structure enables pedestrian and bicycle traffic under railway line no. 220. The underpass was built in an open excavation with full closure of the railway...
by Jan Kowalski | Oct 11, 2024 | Realizations
Construction of a bridge over the river Krówka in Byszewo. Implementation of the task using the proprietary optemPLATE system....
by Jan Kowalski | Oct 11, 2024 | Realizations
Investor: KRJ Spółka z o.o. Architectural design: Forma Architekci sp. z o.o. Task: Construction and detailed design of construction industry....