OptemBLOK – retaining walls for urban overpass

  1. Homepage
  2. Realizations
  3. OptemBLOK – retaining walls for urban overpass
Task: Construction of the southern collector road – stage III from Rzeczypospolitej Ave. to Sikorskiego St., structure WD-01 over railway line no. 137

Investment description: Assembly carried out at night and lasted 1 day. The ramp was made in optemBLOK retaining walls.

Investor: Legnica City Office

Gallery

See our other projects

OptemFRP – composite footbridge installation

OptemFRP – composite footbridge installation

Investment description: Construction of a footbridge over the Kumiela river under the task "Expansion of the cycling and pedestrian route system in public road corridors in Elbląg". Structure parameters: bridge length – 16 m, usable width – 3 m,...

read more
OptemFRP – composite deck bridge reconstruction

OptemFRP – composite deck bridge reconstruction

Task: Reconstruction of the bridge over the Łaźna Struga river in the village of Zamoście on road no. 1877N Structure parameters: length 20 m, width 7.7 m, structural height 0.15 m Scope of work: construction of a new composite deck with integrated road...

read more
OPTEM

ul. Na Zboczu 75
80-110 Gdańsk
NIP: 584-273-97-54
KRS:0000541567

tel: (+48) 58 346-40-40
fax: (+48) 58 742-10-70

office@optembridge.com