Investment description: Construction of a footbridge over the Kumiela river under the task "Expansion of the cycling and pedestrian route system in public road corridors in Elbląg". Structure parameters: bridge length – 16 m, usable width – 3 m,...

read more
OptemFRP – composite deck bridge reconstruction

OptemFRP – composite deck bridge reconstruction

Task: Reconstruction of the bridge over the Łaźna Struga river in the village of Zamoście on road no. 1877N Structure parameters: length 20 m, width 7.7 m, structural height 0.15 m Scope of work: construction of a new composite deck with integrated road...

read more
General – S19 expressway design and execution

General – S19 expressway design and execution

Task: Design and construction of S19 expressway on the section Bielsk Podlaski Zachód junction (without junction) – Boćki junction (with junction). Investor: General Directorate for National Roads and Motorways.Galeria

read more
OptemARCH – viaduct assembly for expressway section

OptemARCH – viaduct assembly for expressway section

Task: Construction of S7 expressway on the section Nidzica – Napierki (voivodeship border) from km 203+500 to km 223+818 Execution description: Assembly of the arch viaduct in Napierki. Construction of the S7 expressway. Prefabricated elements based...

read more
OptemFRAME – wildlife overpass over expressway

OptemFRAME – wildlife overpass over expressway

Investment description: Overpass for large animals designed over S5 road at km 6+009.90 for environmental purposes. Completion: 2918 r. Task: Construction of S5 expressway Poznań – Wrocław, section Wronczyn – Kościan South Investor: General Directorate for...

read more
OptemBLOK – retaining walls for urban overpass

OptemBLOK – retaining walls for urban overpass

Task: Construction of the southern collector road – stage III from Rzeczypospolitej Ave. to Sikorskiego St., structure WD-01 over railway line no. 137 Investment description: Assembly carried out at night and lasted 1 day. The ramp was made in optemBLOK...

read more
General – residential building with commercial unit

General – residential building with commercial unit

Project description: Rezydencja Kino Marynarz was developed in Gdynia's Obłuże district. The project included 13 apartments and a commercial unit on the first floor. The project was created in the studio of Optem. Implementation : from Q1 2019...

read more
OptemARCH – expressway bridge assembly in 1 day

OptemARCH – expressway bridge assembly in 1 day

Task: Construction of the S6 expressway Słupsk – Gdańsk on the Bożepole Wielkie section. Beginning of the Tricity bypass. Structure: PZGd73 Description: Installation of optemARCH prefabricated elements. Construction of the S6 expressway Słupsk – Gdańsk...

read more
OptemFRAME – railway bridges in modernization project

OptemFRAME – railway bridges in modernization project

Project: Design and construction works on railway line no. 16 on the section Ozorków – Łęczyca from km 35.884 to km 47.397, as part of the project: “Works on railway lines no. 15 and 16 on the section Łódź Kaliska – Zgierz – Kutno” Scope:...

read more
OPTEM

ul. Na Zboczu 75
80-110 Gdańsk
NIP: 584-273-97-54
KRS:0000541567

tel: (+48) 58 346-40-40
fax: (+48) 58 742-10-70

office@optembridge.com