OptemARCH arch precast system
The optemARCH system is flexible and enables rapid commissioning of structures such as bridges, overpasses, footbridges and animal crossings.

Advantages of the optemARCH system
- Rapid realization with precast elements (delivery of the bridge in a month)
In case of urgent implementation, it is possible to deliver the bridge within a month, including demolition of the existing structure. Fully precast elements are used, which minimizes monolithic work. Precast supports and arch vaults are installed quickly and efficiently, reducing construction time.
- Economical solution with wet poured concrete (when time is not a priority)
When time is not a priority, supports can be made as wet poured elements. Such a system creates a quasi-framed structure with an arched cover, which optimizes material consumption and reduces costs, although it increases construction time.

OptemARCH also allows the road cross-section to pass through the bridge structure, which increases functionality. Thanks to minimized maintenance work and simplicity of design, the structures are convenient to operate.

See our projects


LCS Konin odx. Barłogi – Swarzędz


Droga ekspresowa S6, Trasa Kaszubska


Expressway S7 on the Nidzica – Napierki section